Realised missions

  • Moving and installation of cleanrooms ISO 6 and ISO 7 for Front-End and Back-End lines
  • Reorganisation of the specialty gases supply chain for a semiconductor factory (annual savings -200 k€, -50% of the previous cost)
  • Assistance of the project owner for the specifications and desgin of the building of a laboratory
  • Fab to fab wafer processing transfer
  • Design of optical coatings (antireflective coating, edge filter etc.)
  • Training on optical coatings